– the new premises is five times the size of Prefabricated Solutions’ previous site
Leeds, England – Mileway, the leading pan-European last mile logistics real estate company, has signed a c. 50,000 sq ft lease with Prefabricated Solutions, specialists in offsite prefabrication for faster, safer building services installation, at Norquest Industrial Estate, a key logistics hub in Leeds.
Located five miles southwest of Leeds city centre, Norquest Industrial Estate is ideally situated for logistics and distribution. It offers excellent transport links via the A62 and M62, proximity to Morley and Leeds railway stations, and convenient access to Leeds Bradford Airport.
Unit 20 is a modern, self-contained warehouse featuring five ground-level roller shutters across two elevations, 6.2-metre eaves height, LED lighting, ground floor offices, ample parking, and a large secure yard – making it ideally suited for production, logistics, or storage-intensive uses.
As a leader in BIM-driven (Building Information Modelling) modular building service units, Prefabricated Solutions’ new premises will enable the business to meet growing demand while enhancing operational efficiency. Its new headquarters enables the centralisation of operations, increased production capacity, and faster project delivery – all essential to supporting the continued growth of its prefabricated modular systems.
Limited space at its previous site meant the company could handle only one large project at a time, often relying on multiple off-site storage locations. With five times more space now available, it can manage several major projects at once while keeping inventory securely stored on-site.
“This lease highlights the critical importance of high-quality commercial space in driving innovation, operational efficiency, and growth in the logistics and manufacturing sectors. We’re pleased to welcome Prefabricated Solutions to Norquest Industrial Estate as it enters its next phase of expansion,” said Andrew Jones, Mileway Managing Director UK & Ireland.
“We now have the space to grow with efficiency and ease, and can manage multiple projects at once, store everything on-site, and operate far more effectively than before. Thanks to Mileway for the very fast turnaround times,” said Andrew Ormond, Prefabricated Solutions Director.